Tools · Drawings E-501 to E-507
Commercial electrical calculators
Three-phase kVA and amps, service headroom, EV parkade capacity, generator sizing, LED retrofit payback, high-bay lighting layout and feeder voltage drop. Each shows its formula and assumptions, and the arithmetic runs in your browser: nothing is sent anywhere.
-
E-501
Three-phase kVA & amps
Convert between kW, kVA and amps at 120/208 V and 347/600 V, and pick the next standard transformer size.
-
E-502
Service capacity & headroom
Compare a service’s capacity with its recorded peak demand and the loads you plan to add, in kVA and amps.
-
E-503
EV parkade capacity
How many chargers spare capacity supports at full power, and how many share it under load management.
-
E-504
Generator sizing
Add up the loads a generator must carry, allow for power factor and motor starting, and see the kVA to plan around.
-
E-505
LED retrofit payback
Energy and demand saved when fixtures are replaced, and simple payback at the energy price and project cost you enter.
-
E-506
Warehouse lighting layout
How many high-bay fixtures a space needs for the light level you set, the grid they sit on, the spacing check and the lighting power density.
-
E-507
Feeder voltage drop
Voltage drop on a commercial feeder or long branch run at 120/208 V or 347/600 V, with parallel conductor sets, in metres.
-
RFQ
Send the numbers
Have a result, a load list or drawings? Send the scope and a person replies with the questions pricing needs.