Services · Drawings E-101 to E-120
Commercial electrical services in Calgary
Tenant improvements, service upgrades, three-phase power, switchgear, industrial work, lighting and controls, generators, EV charging, fire alarm and life safety, studies and maintenance: scope, sequence, code and what drives the price.
-
E-101
Tenant improvements
Office, retail and restaurant fit-outs: what the base building provides, what the tenant’s electrical scope covers, the drawings and the permits.
-
E-102
Commercial service upgrades
Raising a building’s service: capacity checks, the ENMAX application and investment, CT metering, drawings and the shutdown.
-
E-103
Three-phase power
New three-phase services and single-to-three-phase conversions for equipment, kitchens, shops and EV charging.
-
E-104
Switchgear & transformers
Switchgear, switchboards, panelboards and transformers: replacement, coordination with the utility, lead times and shutdown planning.
-
E-105
Industrial electrical
Motor feeders, motor control centres, drives, controls, cable tray and hazardous locations in plants, shops and warehouses.
-
E-106
LED lighting retrofits
Replacing fluorescent, HID and metal halide lighting with LED: fixtures versus kits, controls, the energy code and payback.
-
E-107
Lighting controls
Occupancy and vacancy sensing, daylight harvesting, scheduling and networked controls, and what the energy code expects.
-
E-108
Generators & transfer switches
Standby and emergency generators, automatic transfer switches, load banks and the testing emergency power systems need.
-
E-109
EV charging: workplace & fleet
Chargers for workplaces, fleets and public parking: capacity, load management, metering and billing, and program status.
-
E-110
EV charging: condos & multi-unit
Making a condo or apartment parkade EV-ready: capacity studies, load management, suite billing and how boards decide.
-
E-111
Fire alarm systems
Fire alarm installation and alteration in commercial buildings: permits, drawings, verification and handover.
-
E-112
Fire alarm & emergency lighting inspections
Annual fire alarm inspection and testing, emergency lighting and exit sign tests, and fixing the deficiencies they find.
-
E-113
Arc flash studies
Arc flash and short-circuit studies, protective device coordination and equipment labels: what an owner commissions and why.
-
E-114
Infrared thermography
Infrared scanning of switchgear, panels and connections under load: when to scan, what a report shows and what happens next.
-
E-115
Preventive electrical maintenance
Electrical preventive maintenance programs: breaker testing, torque, cleaning, planned shutdowns and the annual facility permit.
-
E-116
Design-build electrical
When the electrical contractor carries the design: engineering, drawings, permits, and how design-build compares to tendering.
-
E-117
Commercial new construction
The electrical scope of a new commercial or industrial building, from temporary power and the utility application to energization.
-
E-118
Service calls & repairs
Troubleshooting, lighting repairs and small changes for property managers and facility teams, and how service work is priced.
-
E-119
Structured cabling & low voltage
Data cabling, telecom rooms, Wi-Fi, access control and camera wiring in fit-outs and new buildings: scope, standards, pathways and testing.
-
E-120
Field evaluations & special inspections
Getting imported, modified or unlabelled electrical equipment approved for use in Alberta: field evaluation, special inspection labels and timing.
Looking for a specific job?
A few failed lights, a new piece of equipment, a tenant move-out or a building-wide upgrade: find the job and its quote checklist.