Data · City of Calgary open data

Commercial electrical work in Calgary, by the numbers

Electrical permits at non-residential properties, commercial and industrial building permits, fire alarm and facility permits, and licensed businesses by sector. Aggregates only: no addresses, no names, no contractor rankings.

Queried 2026-09-25Licence OGL – City of Calgary

9,114electrical permits at non-residential Calgary properties, 2023–2025; 61% were alterations to existing buildings1
1,976commercial and industrial building permits in 2025, with $1.56B in estimated project cost2
446fire alarm electrical permits in 2025, up from 204 in 20191
22,856active business licences in the City’s data as of 2026-09-25, across retail, food service, manufacturing and more3
Building permits

Commercial and industrial permits, year by year

New buildings and improvements under the City’s commercial and industrial permit classes. Most of the work is in existing buildings: improvements outnumber new buildings many times over.2

CommercialIndustrial
Commercial and industrial building permits: estimated project cost
YearPermitsTotal est. costMedianFive largest, share
20192,368$1.36B$100,00015.6%
20201,841$0.65B$80,00012.1%
20212,078$1.47B$77,00055.4%
20222,116$1.28B$100,00023.4%
20232,072$1.11B$100,00011.5%
20242,325$1.11B$100,00018.1%
20251,976$1.56B$120,00027.9%
2026*1,500$1.13B$118,00033%

Estimated project cost is the applicant’s estimate for the whole project, not the electrical scope, and a few very large permits move the yearly total. * year to date.

Life safety

Fire alarm permits: 204 in 2019, 446 in 2025

Installing or altering a fire alarm system needs its own electrical permit (and a building permit). The count has risen every year since 2019.1

About half of each year's annual facility permits are issued in a single month-long batch between April and July (2019: 235 of 478 in month 05; 2020: 247 of 459 in month 07; 2021: 232 of 447 in month 05; 2022: 263 of 457 in month 04; 2023: 115 of 221 in month 06; 2024: 137 of 234 in month 06; 2025: 117 of 232 in month 06). 2026 shows only 14 through 2026-09-24 (232 in all of 2025); the usual batch does not appear in the data yet, so 2026 year-to-date is not comparable and must not be read as a decline. Years 2019–2022 average 460 a year against 229 in 2023–2025: an earlier April/May batch stops after 2022. The City does not document why (renewal handling may have changed), so do not present this as a fall in facility maintenance work.

Electrical permits

9,114 permits at non-residential properties, 2023–2025

By the City’s own permit types, and by the kind of property from the assessment roll’s sub-use code. Most permits are contractors altering buildings that already exist.1

By permit type

Contractor alterations, additions and renovations to existing buildings5,556
Contractor wiring in new construction2,235
Fire alarm system674
Annual facility permit (ongoing maintenance/alterations at one facility for a year)549
Solar photovoltaic system62
Communications cabling34
Sign installation4

By property type

Commercial4,797
Industrial1,945
Special purpose1,241
Other NR codes477
Parks and recreation (P codes)399
Vacant/developer land, titled parking and storage units, parkades, utility lots (A codes)206
mixedSubUse48

A property counts as non-residential when its address matches a non-residential parcel on the current assessment roll; unmatched addresses are left out, so every count is a floor. Grouping sub-use codes by their first letter (C commercial, I industrial) is our rule, not the City’s.

Communities

The 25 busiest commercial communities, 2023–2025

Electrical permits at non-residential properties by community. About half of these permits carry no community on the permit record; we fill those from the assessment roll by address. The last column is each community’s rank without that fill.1

Electrical permits at non-residential properties by community, 2023–2025
RankCommunityPermitsCommercialIndustrialRank, record only
1Downtown Commercial CoreResidential · Centre67963101
2BeltlineResidential · Centre32927242
3Stoney 3Industrial · Northeast320205115131
4East Shepard IndustrialIndustrial · Southeast256332134
5FoothillsIndustrial · East202111885
6Manchester IndustrialIndustrial · Centre19949993
7SunridgeIndustrial · Northeast16399419
8VarsityResidential · Northwest1559856
9HighfieldIndustrial · Centre141111148
10Saddle RidgeResidential · Northeast123113047
11Residual Ward 2 - Sub Area 2CResidual Sub Area · North1121030129
12RedstoneResidential · Northeast1101090216
13Sage HillResidential · North106105020
14WestwindsIndustrial · Northeast106256613
15Meadowlark ParkResidential · Centre103103011
16South AirwaysIndustrial · Northeast101226215
17BrentwoodResidential · Northwest10079016
18Royal VistaIndustrial · Northwest9985659
19FranklinIndustrial · Northeast97295825
20Alyth/BonnybrookIndustrial · Centre901747
21HorizonIndustrial · Northeast90176212
22Fairview IndustrialIndustrial · South89293524
23Great PlainsIndustrial · East8628417
24West SpringsResidential · West8677076
25CornerstoneResidential · Northeast8576094
Who the buildings serve

Licensed businesses by sector

Active business licences in the City’s open data as of 2026-09-25. A business can hold more than one licence type, so sectors overlap. Offices and health clinics have no licence type of their own and are not counted.3

Active licensed businesses by sector
SectorBusinesses
Retail stores (premises)8,076
Restaurants and food service (premises)7,164
Personal services (salons, barbers, fitness, tattoo, massage centres)3,439
Warehousing and wholesale2,237
Automotive repair, body shops, dealers and fuel1,992
Manufacturing1,680
Apartment building operators1,268
Hotels, entertainment venues and cinemas564
Private schools and training506
  • Contains information licensed under the Open Government Licence – City of Calgary.
  • Aggregates only. No addresses, no names of people, no business, applicant or contractor names, no permit numbers, and no contractor counts or rankings.

Sources

  1. Electrical Permits and Inspections (dataset vxgy-id5s)The City of Calgary, Open Government Licence – City of Calgary · queried 2026-09-25
  2. Building Permits (dataset c2es-76ed)The City of Calgary, Open Government Licence – City of Calgary · queried 2026-09-25
  3. Calgary Business Licenses (dataset vdjc-pybd)The City of Calgary, Open Government Licence – City of Calgary · queried 2026-09-25