Cost guide · E-306
What an arc flash study and an infrared scan cost in Calgary
An arc flash study and an infrared scan are bought together so often that they get priced as one thing. They answer different questions, cost different amounts of effort and should be quoted on separate lines.
CCT 01Two services, two prices
Search results for arc flash study cost and infrared thermography cost often blur the two. A buyer who asks for one combined number cannot tell what the proposal includes. Start by separating them.
| Arc flash study | Infrared thermography | |
|---|---|---|
| Question answered | How much energy a fault could release at each point, and how protective devices should be set | Which connections and components are running hotter than they should today |
| Main output | A system model, short-circuit and coordination results, incident energy values and equipment labels | A report of thermal findings, with images, equipment identification and severity |
| Priced mainly on | Number of buses and devices, quality of existing records, operating modes, deliverables | Number of panels and gear, access, load conditions, reporting |
| Usually led by | An electrical engineer, with field data from electricians | A thermographer, with an electrician opening and closing equipment |
| What follows | Setting changes, labels, sometimes equipment changes | Repairs, then a rescan to confirm them |
Neither replaces the other. A study does not find a loose lug, and a scan does not tell a worker what protective equipment to wear. The scopes are described on the arc flash studies and infrared thermography service pages.
CCT 02What an arc flash study is priced on
No official source publishes arc flash study prices. The fee follows the engineering and field effort, which you can estimate before asking for proposals:
- Equipment inventory. The count of switchboards, panelboards, transformers, motor control centres and disconnects in scope. Decide the boundary: the whole building, or only equipment above a chosen size.
- Existing records. Current single-line diagrams, cable schedules and recorded breaker and relay settings cut field time. Where records are missing, someone has to open equipment and read nameplates, which is slower and may need shutdowns.
- Utility data. The model needs the available fault current at the service from ENMAX. At 600 A and above, Calgary already expects the single-line diagram to show fault current at every overcurrent device1, so recent permit drawings can supply much of it.
- Operating modes. Generator operation, tie breakers and alternate feeds each add scenarios to model and label.
- Coordination. Whether the study only reports results or also recommends new protective settings, and who implements them.
- Deliverables. Labels printed and installed, the editable model file, and a report written for the building’s electrical safety program.
The current edition of the workplace electrical safety standard is CSA Z462:242. Alberta’s OHS Code does not adopt it by reference; the provincial link is a 2009 technical bulletin that recommended property managers keep a copy of the 2008 edition and that workers follow it3. That makes a study an owner’s risk decision, often prompted by an insurer or a contractor’s safety program, rather than a line set by regulation. The arc flash requirements guide covers the background.
CCT 03What an infrared scan is priced on
No official source publishes thermography prices either. A scan is priced on the equipment covered and the conditions needed to see it:
- Coverage. The number of switchboards, panels, disconnects, transformers and motor control centres, and whether bus duct and rooftop units are included.
- Load. A scan is useful only when equipment is carrying meaningful load. Scheduling around production or occupancy peaks can push the work to particular days or hours.
- Access. Many covers must be removed with the equipment energized so the camera can see the connections. That is work for a qualified electrician under a safe work plan, and the electrician’s time is part of the price.
- Reporting. A useful report ties each finding to a named piece of equipment, records the load at the time and ranks severity. A folder of images without that context is cheaper and hard to act on.
- Follow-up. Whether repairs are quoted separately, and whether a rescan to confirm them is included.
Thermography is usually one task inside a maintenance program. CSA describes Z463, the electrical maintenance guideline, as voluntary and designed for commercial and industrial buildings4. Programs that follow it schedule scanning with cleaning, torque checks and breaker testing. That work is covered under preventive electrical maintenance.
CCT 04Shutdowns and utility charges
Data collection for a study and repairs found by a scan often need equipment de-energized. Where the outage involves the service, ENMAX’s 2026 fee schedule applies:
| Item | Amount |
|---|---|
| Temporary de-energization at the customer’s request | No charge5 |
| Re-energization after that disconnect | $166 per hour5 |
| Work outside 7:00 a.m. to 4:00 p.m. on weekdays, at the customer’s request | $352 per hour5 |
ENMAX needs at least 3 business days’ notice to schedule disconnect and reconnect work6. The larger cost is usually on the customer side: after-hours labour, temporary power and the value of lost operating time. Plan one well-used shutdown for data collection, cleaning, torque checks and label installation rather than several short ones.
Isolation itself carries fixed requirements. Under OHS Code Part 15, hazardous energy must be isolated with a secured isolating device before equipment is serviced, tested or inspected7. Each worker involved needs a personal lock with a unique mark or tag7, and complex group lockout procedures must be certified by a professional engineer7. On a large site, writing that procedure can be a budget line of its own.
Arc flash and energized work
This page is planning information, not instructions. Removing covers from energized equipment exposes workers to shock and arc flash. It is work for qualified people with the right protective equipment under a written safe work plan. Owners and managers should not open switchgear, panels or meter enclosures. For immediate danger, call 911.
CCT 05Permits for the repairs, not the study
A study or a scan alters no wiring, so it is not permitted work. The corrections they lead to often are. Calgary requires an electrical permit for new wiring and for extending or altering existing circuits8. The contractor permit is $112 plus $9.79 per $1,000 of construction value9. The Safety Codes Council adds 4% of the permit fee, with a $4.50 minimum and $560 maximum9. The schedule does not say whether the 4% applies to the base fee only or also to the $112 processing fee, so both readings are shown, the second in brackets.
| Construction value | Base fee | Council fee | Total |
|---|---|---|---|
| $15,000 | $146.85 | $5.87 ($10.35) | $264.72 ($269.20) |
| $60,000 | $587.40 | $23.50 ($27.98) | $722.90 ($727.38) |
| $200,000 | $1,958.00 | $78.32 ($82.80) | $2,148.32 ($2,152.80) |
Facilities that do a steady stream of maintenance can use the annual electrical permit instead: $156 plus a $6.24 council fee, $162.24 in all9. Calgary requires it where a facility employs a full-time journeyman electrician, and a contractor doing maintenance at a facility may also apply1. A weekend or holiday inspection for a shutdown repair is $189 per hour with a $756 minimum9, and a re-inspection is $3279.
CCT 06Wages, the index and what they cannot tell you
Job Bank reports a median wage of $44 an hour for industrial electricians (NOC 72201) in the Calgary region, with a low of $34 and a high of $6210. For power system electricians (NOC 72202) the Calgary-region median is $57.59, a modelled estimate rather than a survey tabulation11. These are employee wages. A study also carries engineering time, and a contractor’s rate covers supervision, vehicles, test equipment, insurance, overhead and margin. Neither series can be multiplied by hours to price a study or a scan. Commercial electrician rates explains the gap.
To date an older proposal, use Statistics Canada’s Calgary non-residential electrical index, which stood at 111.3 in Q2 2026 (2023=100)12, up 1.0% in a year12. It tracks the electrical trade’s cost of building model buildings, not engineering fees, so treat it as a rough guide for time only.
What these numbers are and are not
ENMAX charges and City permit fees are published 2026 amounts. The permit tables are arithmetic on the City’s formula for hypothetical repair values. The wages are employee earnings, and the index is a measure of change. No official source publishes the price of an arc flash study or an infrared scan in Calgary, so this page does not print one.
CCT 07Comparing proposals
For a study, ask each proposal to state:
- the boundary and equipment count, and how missing data will be collected;
- the source of utility fault data and the operating modes modelled;
- whether coordination recommendations are included, and who implements setting changes;
- the label format, who installs labels, and whether you receive the editable model;
- the shutdowns required and the assumptions behind them.
For a scan, compare coverage by named equipment, the electrician support included, the minimum load expected, how inaccessible equipment is reported, and whether a rescan after repairs is priced.
Whole-building numbers mean little. A small office and a plant with several motor control centres may have similar floor areas and very different equipment counts. The bid comparison guide covers the line-by-line method. Sites where studies and scans matter most are data centres, industrial plants and the portfolios run by property and facility managers. The three-phase kVA calculator helps sort equipment by size before the boundary is set.
These fees apply in the City of Calgary. Neighbouring municipalities have their own permit authorities and often a different wire utility.
Questions people ask
How much does an arc flash study cost?
No official source publishes a price. The fee follows the equipment count, the state of existing drawings and settings, the operating modes modelled, the shutdowns needed and the deliverables. Send each engineer the same equipment list and single-line diagram, and ask for field data collection, analysis, labels and coordination on separate lines.
How much does infrared thermography cost?
There is no published schedule. Price follows the number of panels and gear covered, the electrician support needed to open equipment under load, access and scheduling, and the report format. Ask whether a rescan after repairs is included, because a scan without follow-up leaves the findings unverified.
Is an arc flash study required in Alberta?
Alberta’s OHS Code does not adopt CSA Z462. The provincial link is a 2009 technical bulletin that recommended property managers keep the 2008 edition and that workers follow it3. Many owners commission a study because an insurer, a contractor’s safety program or their own risk policy calls for one.
How often should an arc flash study be updated?
This site’s sources set no interval. Check the review interval in the edition of CSA Z462 your electrical safety program follows; the current edition is CSA Z462:242. Update the study when the utility supply, protective settings or major equipment change, because the labels describe the system as it was modelled.
Can a thermography scan and an arc flash study be done in one visit?
Often, in part. Both need access to the same equipment, and field data collection for a study can share the visit. They need different conditions, though: a scan needs equipment under load, while some study data is easier to collect during a shutdown. Ask bidders to price the combined visit and each service alone.
Sources
- Electrical permits for contractorsThe City of Calgary · retrieved 2026-09-25
- CSA Z462:24 Workplace Electrical Safety - Online TrainingCSA Group · retrieved 2026-09-25
- Technical Bulletin Issue No. 37: Arc Flash and Workplace Electrical SafetyGovernment of Alberta (Technical Services Branch) · Dated September 2009; retrieved 2026-09-25
- Z463 - Maintenance of Electrical Systems (white paper)CSA Group · White paper dated July 2013; retrieved 2026-09-25
- ENMAX Power Corporation Distribution Tariff, Terms and Conditions Fee ScheduleENMAX Power Corporation · Effective January 1, 2026
- Temporary disconnect / reconnectENMAX Power Corporation · retrieved 2026-09-25
- Occupational Health and Safety Code, Alta Reg 191/2021 (office consolidation)Alberta King's Printer · Consolidation current as of March 31, 2025 (amendments to AR 210/2024); retrieved 2026-09-25
- Homeowner electrical and plumbing permitsCity of Calgary · retrieved 2026-09-25
- 2026 Building & Trade Permit Fee Schedule (R2026-02)The City of Calgary · 2026 fee schedule, revision R2026-02; retrieved 2026-09-25
- Industrial Electrician in Alberta | Wages - Job Bank (NOC 72201)Employment and Social Development Canada (Job Bank) · Reference period 2023-2024 (Labour Force Survey); wages updated 2025-11-19
- Power System Electrician in Alberta | Wages - Job Bank (NOC 72202)Employment and Social Development Canada (Job Bank) · Reference period 2024 (Small Area Estimation); wages updated 2025-11-19
- Table 18-10-0289-01 Building construction price indexes, by type of building and divisionStatistics Canada · Q2 2026 (April-June 2026); released 2026-07-24
Related
-
E-301
Commercial electrician rates
Charge-out rates versus wages, service-call minimums, crew rates and how commercial electrical work is priced in Calgary.
-
E-302
Electrical cost per square foot
Why commercial electrical is quoted per square foot, what that number hides, and what Calgary’s official indexes show.
-
E-303
Service upgrade & switchgear cost
What moves the cost of a commercial service upgrade: ENMAX investment and contribution, switchgear, CT metering, drawings and shutdowns.